Abbott Power Plant New Clarifier

Due to permitting issues, UIUC was unable to send its wastewater to a water treatment ditch. To allay the issues, PRVN was retained to design a new pre-engineered water treatment building. PRVN provided design so pH excursions from wastewater could be routed to the water treatment ditch. The project also replaced the existing water treatment equipment including the clarifier, pumps, and equalization tank.

Speaker.
Jacob Price, Senior Mechanical Engineer, PRVN Consultants, Inc.